Drilling and Grouting Works for Pressurised Groundwater Conditions of the Semmering Base Tunnel


World Heritage Site: Semmering Railway

Publication Year: 2022

Publication Type: Article

Publication Identifier: WHE39ABD4440A

Summary

The Semmering Base Tunnel (SBT), a critical component of the Baltic-Adriatic Railway Network, successfully addressed complex hydrogeological challenges through innovative drilling and grouting techniques. The study highlights the effective implementation of a Standpipe-Packer system, a cased drilling system with grouting inserts, and a combined cement-polyurethane grout mix (Hybrid Grout) to stabilize the grout under high groundwater pressure conditions. These innovations significantly improved construction processes in areas with pressurized groundwater, including karst-prone limestone and dolomite formations with initial water pressures of up to 25 bar. The research demonstrates how these advanced methods can mitigate risks associated with flowing ground conditions and intense fracturing in transition zones, providing a robust solution for similar geological settings.

Citation

Wannenmacher, H., Entfellner, M., & Hauer, H. (2022). Drilling and Grouting Works for Pressurised Groundwater Conditions of the Semmering Base Tunnel. Geotechnical and Geological Engineering, 40(9), 4377–4391. https://doi.org/10.1007/s10706-022-02160-3

You are here:
World Heritage Explorer > World Heritage Research > Publications > Drilling and Grouting Works for Pressurised Groundwater Conditions of the Semmering Base Tunnel

This website includes data sources licensed under CC BY-SA 4.0. Additional original content by World Heritage Explorer, also licensed under CC BY-SA 4.0. WHE is not affiliated with UNESCO or the World Heritage Committee. Legal Notice. Privacy Policy.

Open Data for an Open World